Development of Othman Road (Northern Section)

Project Description

Development of Othman Road (Northern Section)

The Development of Othman Bin Affan Road – Northern Section (Riyadh), to be delivered under the Royal Commission for Riyadh City’s programme for upgrading major road corridors, involved the improvement of approximately 4.3 km of the corridor and the construction of 7 bridges/grade-separated structures to relieve congestion and streamline traffic flow at key junctions (including the interchanges with King Salman Bin Abdulaziz Road and Anas Bin Malik Road). The project is designed to enhance connectivity and safety in north Riyadh and to increase corridor capacity to 500,000+ vehicles per day.

Project details

Project:

Development of Othman Road (Northern Section)

Client:

Royal Commission for Riyadh City

Consultant:

AtkinsRealis

Location:

Riyadh

Category:

Bridges

Contract Value:

1,095,692,087

JV Leader

Freyssinet SA Joint Venture with HAIF Co

Completion Period

36 Months

Riyadh Metro (Lines 4, 5 and 6)

Project Description

Riyadh Metro (Lines 4, 5 and 6)

The Riyadh Metro project is the largest metro project in the region. It is divided in to three (3) packages and Package 3 was awarded to FAST Riyadh Metro Alliance. The FAST Riyadh Metro Alliance is a consortium comprising multi-national groups known in their respective field of expertise that includes FCC, SAMSUNG, C&T, STRUKTON, FREYSSINET S.A and ALSTOM.

Package 3 is comprised of Lines 4,5 and 6. It has an estimated length of 12.9km for the underground and 58.7km for on grade and elevated viaducts with 25 no. of stations.

Project details

Project:

Riyadh Metro (Lines 4, 5 and 6)

Client:

Royal Commission for Riyadh City

Consultant:

RAMPED (Louis Berger / Hill International - JV)

Location:

Riyadh, Kingdom of Saudi Arabia

Category:

Infrastructure and public realm , Railways, Bridges

Contract Value:

"35,4 billion SAR FSA Share: 10% (3.54 Billion SAR) Works executed by FSA: 2.5 Billion SAR TOTAL FSA Share & Self execution: Approx. 6 Billion SAR"

Project Start:

January, 2013

Project Completion:

October, 2024

Qiddiya – Wadi Bridge

Project Description

Qiddiya – Wadi Bridge

QIC awarded FSA and HAIF (as a Joint Venture) a contract to construct major roads and bridges on the upper plateau of the Qiddiya Site. Scope includes Site preparation, subsurface investigation, cut slope protection & Rock stabilization measures, Roadway earthworks, Pavement construction, Traffic and road marking, drainage works, Bridges and culvert works, Electrical and telecom works, provisional road crossings and Relocation of existing utilities.

Project details

Project:

Qiddiya - Wadi Bridge

Client:

Qiddiya Investment Company (QIC)

Consultant:

Zuhair Fayez Partnership

Location:

Riyadh, Kingdom of Saudi Arabia

Category:

Bridges

Contract Value:

1,094,048,166 SAR FSA Share 58 %

Project Start:

September, 2020

Project Completion:

September, 2024

Sports Boulevard Phase 1 Cycling Bridge

Project Description

Sports Boulevard Phase 1 Cycling Bridge

The Sports Boulevard is a cycling and sports corridor new development, as part of the 2030 vision in Riyadh. FSA Scope of work includes the construction of a pedestrian, a cycle bridge and a gateway shelter. Detailed scope includes, earthworks, utility diversion, bridge structure (concrete columns and steel structure decking), architectural façade (Metal roof & aluminum panel cladding), wayfinding and road signage, pavements, landscape and hardscape, street lighting & urban furniture, stormwater drainage, sewerage network, potable network and electrical networks.

Project details

Project:

Sports Boulevard Phase 1 Cycling Bridge

Client:

Sports Boulevard Foundation

Consultant:

IDOM

Location:

Riyadh, Kingdom of Saudi Arabia

Category:

Bridges

Contract Value:

253,499,990 SAR

Project Start:

April, 2021

Project Completion:

24 Months
May, 2023

King Salman Park Site Wide Infrastructure Package

Project Description

King Salman Park Site Wide Infrastructure Package

The construction of Infrastructure for an area of 13 sq km including Roads, Storm Water, Irrigation, Electric, Data and Security plus the Operation and Maintenance and Control Building at King Salman Park Project.

Project is being executed by the Joint Venture of Freyssinet Saudi Arabia and Haif Contracting Company.

Project details

Project:

King Salman Park Site Wide Infrastructure Package

Client:

King Salman Park Foundation

Consultant:

Faithful+Gould

Location:

Riyadh, Kingdom of Saudi Arabia

Category:

Infrastructure and public realm , Bridges

Contract Value:

1,967,692,689 SAR FSA share is 1,017,692,889 SAR JV with HAIF Co. FSA Share 52 %

Project Start:

September, 2021

Project Completion:

18 Months
Mar, 2023

Makka – Madinah Expressway Section V

Project Description

This section extends over a length of 50Km and contains 24 bridges and interchanges most of them spanning deep in the valleys. The scope of work was the design of precast girders, procurement of moulds and technical know- how of introducing the precast segmental system plus the complete prestressing work and the erection of precast girders over the deep valleys for which the special technique of launching beams was introduced.

Project details

Project:

Makka - Madinah Expressway Section V

Client:

Ministry of Municipal and Rural Affairs

Consultant:

Nizar Kurdi

Location:

Kingdom of Saudi Arabia

Category:

Bridges

Contract Value:

20 Million SAR

Project Start:

---

Project Completion:

1984

Intersection Sary and Prince Sultan Street

Project Description

Construction of a fly over at the intersection of Sary/Sultan Street. The bridge consists of post tension precast girders of 30m span each.

Project details

Project:

Intersection Sary and Prince Sultan Street

Client:

Municipality of Jeddah

Consultant:

Fluor Arabia

Location:

Jeddah, Kingdom of Saudi Arabia

Category:

Bridges

Contract Value:

30 Million SAR

Project Start:

---

Project Completion:

2009

Improvement of Jamarat & Surrounding Area

Project Description

This four level segmental bridge with access ramps, service buildings and helipad towers is designed to carry the heavy flow of pilgrims during the holy period of Hajj. Each level of the bridge is composed of three ellipses and a passage extending over 600m with a variable span of 60m to 100m. In addition, each level of the bridge deck is composed of 1260 concrete precast segments that weigh between 44 and 60 tons. FSA scope of work includes the lifting and erection of precast segments using specially designed movable lifting devices, 70 tons capacity in addition to all prestressing, horizontal jacking, and geometry adjustment works. The technical parameters of the project and the deployed resources to achieve the works within the limited time make this project one of the most contemporary challenging constructions

Project details

Project:

Improvement of Jamarat & Surrounding Area

Client:

Ministry of Municipal and Rural Affairs

Consultant:

Dar Al-Handasah

Location:

Makkah, Kingdom of Saudi Arabia

Category:

Bridges

Contract Value:

280 Million SAR

Project Start:

---

Project Completion:

2009

Automated People Mover (APM) – Princess Noura Bint Abdulrahman University for Women

Project Description

This Light Train project comprises of the Construction of a 13km elevated concrete guide-way and supply/installation of track work for the APM (light rail system) for Princess Noura University that will have a ridership capacity of 6200 people per hour.

FSA is working with SBG group on this project. FSA ‘s scope of work includes the design & build of the guideway structure and track work.

Project details

Project:

Automated People Mover (APM) - Princess Noura Bint Abdulrahman University for Women

Client:

Princess Noura Bint Abdulrahman University

Consultant:

Dar Al-Handasah

Location:

Riyadh, Kingdom of Saudi Arabia

Category:

Bridges, Railways

Contract Value:

320 Million SAR

Project Start:

Dec, 2009

Project Completion:

May, 2011

PSM /BCM Package – Riyadh Metro

Project Description

This project comprises of the viaducts construction using the PSM (precast segmental method) and BCM (balanced cantilever method) for the Riyadh Metro project package “3”. The Lines included in this contract are Lines (4) and (6), each line consists of two elevated bridges “viaducts”.

Project details

Project:

PSM/BCM Viaducts (Riyadh Metro)

Client:

Arriyadh Development Authority

Consultant:

RAMPED (Louis Berger / Hill International - JV)

Location:

Riyadh, Kingdom of Saudi Arabia

Category:

Bridges, Railways

Contract Value:

439 Million SAR

Project Start:

October, 2014

Project Completion:

December, 2017