Expo 2030 Metro Station

Project Description

Expo 2030 Metro Station

The Expo 2030 Riyadh Metro Station is a landmark Design & Build project for RCRC that will serve the Expo 2030 site and connect it to Riyadh’s metro network through Line 4, with provision for future integration with Line 7. The station is intended to function as a major intermodal gateway and combines a complex architectural concept with extensive structural, MEP, rail-system and public-realm interfaces.

Key Project Features:

  • Main Metro Station serving Expo 2030 and Riyadh Metro Line 4
  • Long-span steel superstructure
  • Complex glazed façades and ETFE roof with integrated photovoltaics
  • Landscape and public realm works, including interfaces with Expo and Roshn
  • Utilities and infrastructure networks
  • Specialized railway systems and extensive multidisciplinary coordination

Project details

Project:

Expo 2030 Metro Station

Client:

Royal Commission for Riyadh City (RCRC)

Consultant:

RMTC (Parsons, Egis & Systra)

Location:

Riyadh, Saudi Arabia

Contract Type:

Design & Build

Contract Value:

SAR 1,593,644,524.42 (including VAT)

LDC

GERBER

Completion Period:

36 Months

King Salman Park Grand Mosque

Project Description

King Salman Park Grand Mosque

Grand Mosque – Traditional design with modern sustainability, shaded open spaces, 66m minaret, accommodates 3,900 worshippers

Hub 03 – Central support zone within the project.

Arabian Garden – Integrates indigenous plants, harmonized with mosque and surroundings.

Tunnel & Gateway 04 – Infrastructure and access integration.

District 3 – Largest zone in the project, mixed-use development.

Mosque Features: Passive cooling (basement), main prayer hall (GF), female area (FF), PV panels (roof).

Project details

Project:

King Salman Park Grand Mosque

Client:

King Salman Park Foundation

Consultant:

WSP

Location:

Riyadh

Category:

Non- Residential building

Contract Value:

1,253,801,073

Scope of Work:

Construction

Completion Period:

22 Months

King Salman Park Infrastructure Works Ph 02

Project Description

King Salman Park Infrastructure Works Ph 02

Site Preparation: Includes clearing, grading, and initial groundwork.

Utility Installation: Installation of complete wet and dry utility networks, including power (MV, LV, UPS), ICT, lighting, potable water, sewage, stormwater, irrigation, and district cooling systems.

Bridge Construction: 6 bridge structures (4 Loop Bridges and 2 BLVD Bridges)

Drainage & Landscaping: Incorporates effective stormwater systems and aesthetic landscaping elements.

Project details

Project:

King Salman Park Infrastructure Works Ph 02

Client:

King Salman Park Foundation

Consultant:

Faithful+Gould

Location:

Riyadh

Category:

Non- Residential building

Contract Value:

3.2 billion SAR

Scope of Work:

Construction – Remeasured

JV Leader:

Freyssinet SA

Completion Period:

30 Months

Development of Othman Road (Northern Section)

Project Description

Development of Othman Road (Northern Section)

The Development of Othman Bin Affan Road – Northern Section (Riyadh), to be delivered under the Royal Commission for Riyadh City’s programme for upgrading major road corridors, involved the improvement of approximately 4.3 km of the corridor and the construction of 7 bridges/grade-separated structures to relieve congestion and streamline traffic flow at key junctions (including the interchanges with King Salman Bin Abdulaziz Road and Anas Bin Malik Road). The project is designed to enhance connectivity and safety in north Riyadh and to increase corridor capacity to 500,000+ vehicles per day.

Project details

Project:

Development of Othman Road (Northern Section)

Client:

Royal Commission for Riyadh City

Consultant:

AtkinsRealis

Location:

Riyadh

Category:

Bridges

Contract Value:

1,095,692,087

JV Leader

Freyssinet SA Joint Venture with HAIF Co

Completion Period

36 Months

King Salman Park – Grand Mosque & Arabian Garden, Hub3, Gate 4, District 3 and Tunnel 4

Project Description

A Grand Mosque with a 16,153m2 BUA, accommodating 3,900 worshippers. Arabic Gardens span 85,552m^2, and a two-floor underground parking covers 29,408m^2 for 705 cars. Total area: 94,622m^2.

 

Project details

Project:

King Salman Park - Grand Mosque & Arabian Garden, Hub3, Gate 4, District 3 and Tunnel 4

Client:

King Salman Park Foundation

Consultant:

WSP

Location:

Riyadh

Category:

Non- Residential building

Contract Value:

1,253,801,073 SRA EXC VAT

Project Start:

20 Oct 2024

Expected Finish date

22 Months

Mina Bulk Water Reservoir No. 2

Project Description

Pioneering technology was needed to undertake this unique structural design of a reservoir with a capacity of 600,000 cubic meters of water.

The Aluminium roof cover measuring 45,000 m2 consists of two rows of inclined columns of 40m height with precast prestressed segmental beams spanning 150m located between each of the four columns, and suspended by prestressed cables from the top of the adjacent columns, to form the conical profile bearing the aluminium cover cladding.

Project details

Project:

Mina Bulk Water Reservoir No. 2

Client:

Ministry of Municipal and Rural Affairs

Consultant:

Dar Al- Handasah

Location:

Makkah

Category:

Industrial Facilities

Contract Value:

28 Million SAR

Project Start:

---

Project Completion:

1983

Jet Propulsion Centre

Project Description

Jet Propulsion Center

The project consists of the construction of the NEW Jet Propulsion Center of a Engine Maintenance Auxiliary Power Unit facility located within the King Abdul Aziz International.

The building is made of reinforced concrete sub-structure, its super structure is of structural steel framing. External walls are made of precast concrete panels while its roof cover adopts the use of standing seam metal roofing system. The Facility has a mezzanine floor, a court yard with a uniquely designed mosque and attached three level administrative offices. The external development includes utilities, ground paving and landscaping, guard houses, ground parking cover, retaining walls, perimeter fence and gates.

Project details

Project:

Jet Propulsion Centre

Client:

Saudia Aerospace Engineering Industries

Consultant:

Ghafari Associates

Location:

Jeddah, Kingdom of Saudi Arabia

Category:

Industrial Facilities

Contract Value:

514,971,727 SAR

Project Start:

September, 2013

Project Completion:

May, 2025

SAJAPHJCO Factory

Project Description

This factory project covering a total built up area of 5500 m2 consists of several buildings that include the main building consisting of production halls, laboratories, research division, stores and pacing halls.

The project is distinguished by the special finishing materials used and sophisticated electro-mechanical units that include special sterilizing systems. The techniques, technology and material used in this project meet international standards of the best pharmaceutical factories.


Project details

Project:

SAJAPHCO Factory

Client:

SAJAPHCO

Consultant:

JGC Arabia (Japan)

Location:

Jeddah, Kingdom of Saudi Arabia

Location:

Industrial Facilities

Contract Value:

49 Million SAR

Project Start:

---

Project Completion:

1999

L4 Depot Package – Riyadh Metro

Project Description

Depot Facilities are located next to line 4 Metro Railway, the buildings in this project are: Stabling Area, Manual Washing Area, Wayside Area, Workshop Area, Energy Building, Car Park Area, Administration Building, Automatic Washing Plant. The main purpose of this building is to serve the trains of the Metro regarding (maintenance, parking, cleaning And checking) and also to control and monitor all the systems for Riyadh Metro Project.

Project details

Project:

L4 Depot Package - Riyadh Metro

Client:

Royal Commission for Riyadh City

Consultant:

R A M P E D (Louis Berger / Hill International - JV)

Location:

Riyadh, Kingdom of Saudi Arabia

Category:

Industrial Facilities, Railways

Contract Value:

324,709,855 SAR

Project Start:

---

Project Completion:

Nov, 2023